Construction updates

What are the works for?

We’re installing high-capacity underground pipework across Enfield to form a heating super-highway. In the future branches will be added to supply residents across Enfield with heating and hot water from Energetik’s near zero carbon energy centre at the Edmonton Eco- Park. This will help decarbonize heating and hot water in tens of thousands of homes in the borough, as part of Enfield’s wider net-zero ambitions. In order to achieve this, we will install pipework in the ground that we expect will never have to be revisited until the end of its useful life at the turn of the next century.

How will the works be delivered?

Whilst we appreciate that any road disruption can cause inconvenience, we have designed the route to minimise disruption, including maintaining existing bus routes, adequate access for all local residents, and for the majority of the route, we will maintain a two way traffic flow as normal. The works will be delivered in short 50m-100m sections, which will result in some parking bays being suspended as the works move along Hertford Road. The work areas will be segregated by suitable fencing to ensure a safe working area for the work force and provide a safe route for the public at all times.

We have notified the local community living in the immediate area by way of letter to all properties along the length of the streets affected and into adjoining streets. For those outside of this local delivery area, the advanced warning notices, have been put up to advise those passing through. For information on each section, please see more information below, and on the Enfield Council’s website: https://www.enfield.gov.uk/services/roads-and-transport/road-works.

  • Current works: Fore Street, N9 0OG

    Location/Area: Fore Street, N9 0OG

    Estimated start date: 17th June 2024

    Estimated end date: 27th July 2024

    Reason:  Heat Network Extension

    Working hours: Monday to Friday 08:00 – 17:30 and Saturday 08:00 – 13:00

    For more information, consult the Enfield Council’s dedicated page: Road closures 

    These works are a continuation of those carried out in Plevna Road during early/mid 2023 and involve the installation of large diameter pipes, primarily in the carriageway.

    The first phase of work will begin with the closure of Plevna Road at its junction with Fore Street.

    Phase 1 (road closure): One week in duration – 17th June 2024 – 23rd June 2024.

    Phases 2-4 will have temporary traffic signals or a contra-flow traffic system as below. Efforts will be made to maintain two-way traffic flow whenever possible.

    Phase 2 (lane closure): Two weeks in duration – 24th June 2024 – 7th July 2024.

    Phase 3 & 4 combined (lane closure): Three weeks in duration – 8th July 2024 – 27th July.

    Phase 4: Three weeks in duration in combination with phase 3

    Buses that would normally travel northbound along Plevna Road will be diverted via Monmouth and St Martin’s Roads.

    How may this work affect you?

    Access and Parking:

    We will always seek to maintain access. In the event you might need assistance, please ask a member of our staff by contacting us with the numbers provided below.

    Bus lane and cycle lane will be temporary closed during construction activities for approximately 100m long distance.

    Refuse collections will continue to take place as normal as access to all properties and businesses will be maintained by the signed diversion route

    The work areas will be segregated by suitable fencing to ensure safe working area for the work force and provide safe route for public.

    Useful Contact details

    Emergency / Out of Hours Contacts:

    Site Manager:                Andrew Heffernan – 07384 298 392

    Project Manager:          Dan Pintea – 07478 833 389

    Contracts Manager:     Hakan Balcioglu – 07306 502 902

  • Current works: 58 Fore Street, N18 2SW

    Location/Area: 58 Fore Street, N18 2SW

    Estimated start date: 17th June 2024

    Estimated end date:  8th August 2024

    Reason:  Heat Network Extension

    Working hours:  08:00 – 17:30, Saturday 08:00 – 13:00 and Sunday 09:00 – 13:00 (non-noisy works)

    For more information, consult the Enfield Council’s dedicated page: Road closures 

    Following the completed works on Stockton and Claremont Road, the first phase of work will begin with a closure of Claremont Street at its junction with Fore Street.

    The first phase of works will be carried out in Claremont Street and to provide sufficient space for the works it will be closed to all vehicles with diversions in place via surrounding streets but with two-way traffic flows maintained on Fore Street.

    Phase 1 (road closure): Four weeks in duration – 17th June 2024 – 7th July 2024.

    Diversion Route

    The second and third phases of works will use temporary traffic signals on Fore Street and some banned vehicle turns (right turn into/out of Grove Street.

    Phase 2 (lane closure): One week in duration – 8th July 2024 – 14th July 2024.

    Phase 3: Three weeks in duration 15th July 2024 – 8th August 2024.

    How may this work affect you?

    Access and Parking:

    Access will always be maintained for residents. In the event you might need assistance, please ask a member of our staff by contacting us with the numbers provided below.

    During Claremont Road phase of work, multiple parking bays will be suspended for the duration of works.

    Refuse collections will continue to take place as normal as access to all properties and businesses will be maintained by the signed diversion route

    The work areas will be segregated by suitable fencing to ensure safe working area for the work force and provide safe route for public.

    Useful Contact details

    Emergency / Out of Hours Contacts:

    Site Manager:                  Bogdan Roatis – 07736 6395 599

    Project Manager:            Dan Pintea – 07478 833 389

    Contracts Manager:        Hakan Balcioglu – 07306 502 902

  • Current works: Closure of Grosvenor Road, N9

    Location/Area: Houndsfield Road/Hertford Road, N9 

    Estimated start date: 02nd July 2024

    Estimated end date: 09th July 2024

    Reason:  Heat Network Extension

    Working hours: Monday to Friday 08:00 – 17:30, Saturday 08:00 – 13:00 and Sunday 09.00 – 13:00 (non-noisy works)

    For more information, consult the Enfield Council’s dedicated page: Road closures 

    This phase of works is intended to allow for two-way traffic flow on Hertford Road to be maintained and involves the removal of the rain garden on the corner of Grosvenor Rd along with the levelling out of the speed table across the junction. In order to carry out this work it will be necessary to close the junction of Grosvenor Rd with Hertford Rd for around 1 week.

    How may this work affect you?

    Access and Parking:

    Access will always be maintained for residents. In the event you might need assistance, please ask a member of our staff by contacting us with the numbers provided below.

    The work areas will be segregated by suitable fencing to ensure safe working area for the work force and to provide a safe route for the public at all times.

    Useful Contact details

    Emergency / Out of Hours Contacts:

    Project Manager:          Tony Doona – 07960 547 252

    [email protected]

  • Current works: 61 – 73 Montagu Rd, N18 2LX

    Location/Area: 61 – 73 Montagu Rd, N18 2LX

    Estimated start date: 25th July 2024

    Estimated end date: 8th September 2024

    Reason:  Heat Network Extension

    Working hours: Monday to Friday 07:00 – 23:00, noisy activities between 08:00 to 20:00
    Saturday 08:00 – 14:00, with noisy activities between 08:00 to 13:00
    Sunday 09:00 – 15:00, with noisy activities between 09:00 to 13:00

    For more information, consult the Enfield Council’s dedicated page: Road closures 

    Following the completed works on Angel Walk, and concurrently with ongoing work on Kenninghall Rd, PPC will be carrying out District Heating Network installation on Montagu Rd and Kenninghall Rd.

    To ensure the safety of all road users and operatives the works will be carried out under a directional road closure of Montagu Road from its junction with Conduit Ln to its junction with Rays Road. The works are scheduled between 25th July 2024 to 31st August 2024 and during this time vehicles that would normally enter Montagu Road at the Conduit Lane junction will be diverted as shown on the attached plans.

    There will be future works to connect the pipes in Montagu Road and Kenninghall Road and we will communicate again when these are scheduled to take place

    How may this work affect you?

    Access and Parking:

    Access will always be maintained for residents. In the event you might need assistance, please ask a member of our staff by contacting us with the numbers provided below.

    The work areas will be segregated by suitable fencing to ensure safe working area for the work force and to provide a safe route for the public at all times.

    Useful Contact details

    Emergency / Out of Hours Contacts:

    Site Manager:             Andrew Heffernan – 07384 298 392
    Project Manager:       Dan Pintea – 07478 833 389
    Contracts Manager:  Hakan Balcioglu – 07306 502 902

    [email protected]