What are the works for?

We’re installing high-capacity underground pipework across Enfield to form a heating super-highway. This pipework will form part of Energetik’s borough-wide heat network, which will in future supply heating and hot water from the near zero-carbon Energy Centre at Edmonton EcoPark to homes, businesses, schools, and community and council buildings across the borough. The project will help reduce carbon emissions and support Enfield’s ambition to become a net-zero borough.

How will the works be delivered?

Whilst we appreciate that any road disruption can cause inconvenience, we have designed the route to minimise disruption, including maintaining existing bus routes, adequate access for all local residents, and for the majority of the route, we will maintain a two way traffic flow as normal. The works will be delivered in short 50m-100m sections, which will result in some parking bays being suspended as the works move along Hertford Road. The work areas will be segregated by suitable fencing to ensure a safe working area for the work force and provide a safe route for the public at all times.

We have notified the local community living in the immediate area by way of letter to all properties along the length of the streets affected and into adjoining streets. For those outside of this local delivery area, the advanced warning notices, have been put up to advise those passing through. For information on each section, please see more information below, and on the Enfield Council’s website: https://www.enfield.gov.uk/services/roads-and-transport/road-works.

  • Overview of planned works

    Location/Area: Hertford Road

    Estimated start date: April 2025

    Estimated end date: January 2026

    Reason:  Heat Network Extension

    For more information, consult the Enfield Council’s dedicated page: Road closures 

    Many works have been conducted on Hertford Road over the past months.  We thought it may help to show the planned works for the rest of the road so you are aware of what you can expect.

    The map shows the completed, current and planned works.  We are working closely with TFL and the Highways department to minimise disruption to residents, business and traffic. As a result the dates on the map that can be seen in full screen mode are subject to change based on our discussions with the various departments.

    You can enlarge the map by clicking the top right square of the map, this will open it in full screen mode.

  • Planned works: Cuckoo Hall Lane, N9 8DH

    Location/Area: Cuckoo Hall Lane, N9 8DH

    Estimated start date: 26th May 2026

    Estimated end date: September 2026

    Working hours: Monday – Friday: 08:00 – 18:00; Saturday: 08:00 – 13:00

    Reason:  Heat Network Extension

    Traffic Management: Road closure and parking suspension

    For more information, consult the Enfield Council’s dedicated page: Road closures 

    The following section of works will be divided in two phases.

    When will the works take place?

    Works are scheduled from 26 May 2026 to September 2026

    What to expect:

    To carry out these works safely, temporary traffic management will be required:

    Parking bays will be suspended inside the work perimeter, access to driveways will be maintained during the works.  Please click on the maps to enlarge them.

    • Phase 1Cuckoo Hall Lane N9, closed at the junction with Hertford Rd N9 for approximately 100m. Beatrice Road closed at its junction with Cuckoo Hall Lane approximately for 5m.
    • Phase 2Cuckoo Hall Lane closed between Beatrice Road and Turin Rd. Scarborough Road closed at its junction with Cuckoo Hall Lane for approximately 5m.
    • Phase 3Cuckoo Hall Lane closed from Scarborough Road to Nightingale Road. Turin Rd closed at its junction with Cuckoo Hall Lane for approximately 5m.

    We will make every effort to minimise disruption and complete the works as quickly and safely as possible

    How may this work affect you?

    Access and Parking:

    Pedestrian and vehicle access will always be maintained for residents. In the event you might need assistance, please ask a member of our staff by contacting us with the numbers provided below.  

    The work areas will be segregated by suitable fencing to ensure a safe working area for the work force and provide a safe route for the public. 

    Useful Contact details

    Emergency / Out of Hours Contacts:

    Site Manager:             Bogdan Roatis – 07366 395 599
    Project Manager:       Dan Pintea – 07478 833 389
    Contracts Manager:  Hakan Balcioglu – 07306 502 902

    [email protected]